Documents Download Page
Welcome to the project documentation page. Here you will find relevant information about the project. As new details become available, we will update this page.
We understand that some of these documents may be large files. If you experience any difficulty in downloading them, please let us know, and we will be happy to assist you.
Non-Statutory Consultation
PEIR Non-Technical Summary (‘NTS’)
PEIR Chapter 6 Cultural Heritage
PEIR Chapter 7 Landscape and Visual
PEIR Chapter 10 Socio Economics
PEIR Chapter 11 Ground Conditions
PEIR Chapter 12 Summary and Residual Effects
Figure 2.1 Cumulative Schemes within 10km of Draft Order Limits
Figure 2.2 Utilities within the Site
Figure 3.2 Topography of Site and Surroundings
Figure 3.3 Solar Farm Area Plan
Figure 3.5 Indicative Solar Module
Figure 3.6 Indicative Solar inverter (6M)
Figure 3.7 Indicative Solar inverter (12M)
Figure 3.8 Indicative Battery Container
Figure 3.9 Indicative Battery Interface Container
Figure 3.10 Indicative PCS Unit
Figure 3.11 Indicative Access Tracks (Standard)
Figure 3.12 Indicative Access Tracks (No Dig)
Figure 3.13 Indicative Site Perimeter Fencing
Figure 3.15 Indicative Security Camera Design
Figure 4.2 Combined Constraints Plan
Figure 4.3 - Dean Moor ZTV combined
Figure 4.4 Alternative Land Parcels ALC
Figure 6.1 HER evidence within 1km of the draft Order Limits
Figure 6.2 Designated Heritage Receptors within 3km of the draft Order Limits
Figure 6.3 Zone of Theoretical Visibility
Figure 7.1 Landscape Designations Plan
Figure 7.2a Published Landscape Character (CCC)
Figure 7.2b Published Landscape Character (LDNP)
Figure 7.3 Dean Moor Topography Plan
Figure 7.4 - Zone of Theoretical Visibility (DTM) with View Locations
Figure 7.5a - ZTV of Point of Connection Compound Parameter Area
Figure 7.5b - ZTV of Indicative Battery Energy Storage Solution Compound Parameter Area
Figure 7.5c - ZTV of Solar Development Parameter Area
Figure 7.5d - Zone of Theoretical Visibility
Figure 7.6 Environmental Measures Plan
Figure 9.1 - Dean Moor UK Climate Projection 25km grid square
PEIR Appendices
Appendix 1.1 Statement of Expertise
Appendix 2.1 EIA Scoping Report
Appendix 2.2 EIA Scoping Opinion
Appendix 2.6 Transport Statement
Appendix 2.7 Prelim Noise and Vibration Impact Assessment
Appendix 6.2 Archaeological Geophysical Survey
Appendix 7.2 Schedule of Landscape Effects Table
Appendix 7.3 Schedule of Visual Effects Table
Appendix 7.4 Photosheets Part 1
Appendix 7.4 Photosheets Part 2
Appendix 7.5 Outline Arboricultural Impact Assessment Part 1
Appendix 7.5 Outline Arboricultural Impact Assessment Part 2
Appendix 7.5 Outline Arboricultural Impact Assessment Part 3
Appendix 8.1 PEA and GCN Report PEIR
Appendix 8.3 Dean Moor Bat Survey Report
Appendix 8.4 Dean Moor Otter and W.V. Survey Report
Appendix 8.5 Dean Moor Breeding Bird Survey Report
Appendix 9.1 Dean Moor Solar ATC Data Summary
Appendix 9.2 Dean Moor Construction EFT
Appendix 9.3 Dean Moor Carbon Calculations
Appendix 9.4 Mean Annual Air Temperature Anomaly
Appendix 9.5 Annual Precipitation Anomaly
Appendix 9.6 Maximum Summer Temperature Anomaly
Appendix 9.7 Summer Precipitation Anomaly
Appendix 9.8 Minimum Winter Temperature Anomaly
Appendix 9.9 Winter Precipitation Anomaly
Statutory Consultation Documents
Preliminary Environmental Information Report (PEIR)
Correction: At paragraph 3.2.1 of the PEIR Non-Technical Summary and paragraph 3.2.1 of Chapter 3 of the PEIR reference is made to the proposed solar farm being ‘6.5km east of the small village of Gilgarran’. This is incorrect, and should instead read ‘650m east of the small village of Gilgarran’. We apologise for any confusion this may have caused. The Applicant confirms that assessments undertaken as part of the PEIR have been undertaken in respect of the land 650m east of Gilgarran, and so are not impacted by this error.