Documents Download Page

Welcome to the project documentation page. Here you will find relevant information about the project. As new details become available, we will update this page.

We understand that some of these documents may be large files. If you experience any difficulty in downloading them, please let us know, and we will be happy to assist you.

Non-Statutory Consultation

Preface and Contents

PEIR Non-Technical Summary (‘NTS’)

PEIR Chapter 1-5

PEIR Chapter 6 Cultural Heritage

PEIR Chapter 7 Landscape and Visual

PEIR Chapter 8 Biodiversity

PEIR Chapter 9 Climate Change

PEIR Chapter 10 Socio Economics

PEIR Chapter 11 Ground Conditions

PEIR Chapter 12 Summary and Residual Effects

Figure 1.1 Site Location Plan

Figure 2.1 Cumulative Schemes within 10km of Draft Order Limits

Figure 2.2 Utilities within the Site

Figure 3.1 Concept Layout

Figure 3.2 Topography of Site and Surroundings

Figure 3.3 Solar Farm Area Plan

Figure 3.4 - Land Use Plan

Figure 3.5 Indicative Solar Module

Figure 3.6 Indicative Solar inverter (6M)

Figure 3.7 Indicative Solar inverter (12M)

Figure 3.8 Indicative Battery Container

Figure 3.9 Indicative Battery Interface Container

Figure 3.10 Indicative PCS Unit

Figure 3.11 Indicative Access Tracks (Standard)

Figure 3.12 Indicative Access Tracks (No Dig)

Figure 3.13 Indicative Site Perimeter Fencing

Figure 3.14 Security Fencing

Figure 3.15 Indicative Security Camera Design

Figure 4.2 Combined Constraints Plan

Figure 4.3 - Dean Moor ZTV combined

Figure 4.4 Alternative Land Parcels ALC

Figure 6.1 HER evidence within 1km of the draft Order Limits

Figure 6.2 Designated Heritage Receptors within 3km of the draft Order Limits

Figure 6.3 Zone of Theoretical Visibility

Figure 7.1 Landscape Designations Plan

Figure 7.2a Published Landscape Character (CCC)

Figure 7.2b Published Landscape Character (LDNP)

Figure 7.3 Dean Moor Topography Plan

Figure 7.4 - Zone of Theoretical Visibility (DTM) with View Locations

Figure 7.5a - ZTV of Point of Connection Compound Parameter Area

Figure 7.5b - ZTV of Indicative Battery Energy Storage Solution Compound Parameter Area

Figure 7.5c - ZTV of Solar Development Parameter Area

Figure 7.5d - Zone of Theoretical Visibility

Figure 7.6 Environmental Measures Plan

Figure 9.1 - Dean Moor UK Climate Projection 25km grid square

Figure 10.1 - Local and Wider Study Area

PEIR Appendices

Appendix 1.1 Statement of Expertise

Appendix 2.1 EIA Scoping Report

Appendix 2.2 EIA Scoping Opinion

Appendix 2.3 WFD Assessment

Appendix 2.4 FRA Part 1

Appendix 2.4 FRA Part 2

Appendix 2.4 FRA Part 3

Appendix 2.5 OCTMP

Appendix 2.6 Transport Statement

Appendix 2.7 Prelim Noise and Vibration Impact Assessment

Appendix 2.8 Framework BSMP

Appendix 5.1 Outline CEMP

Appendix 6.1 HEDBA

Appendix 6.2 Archaeological Geophysical Survey

Appendix 7.1 LVIA Methodology

Appendix 7.2 Schedule of Landscape Effects Table

Appendix 7.3 Schedule of Visual Effects Table

Appendix 7.4 Photosheets Part 1

Appendix 7.4 Photosheets Part 2

Appendix 7.5 Outline Arboricultural Impact Assessment Part 1

Appendix 7.5 Outline Arboricultural Impact Assessment Part 2

Appendix 7.5 Outline Arboricultural Impact Assessment Part 3

Appendix 7.6 Glint & Glare

Appendix 8.1 PEA and GCN Report PEIR

Appendix 8.2 NVC Report

Appendix 8.3 Dean Moor Bat Survey Report

Appendix 8.4 Dean Moor Otter and W.V. Survey Report

Appendix 8.5 Dean Moor Breeding Bird Survey Report

Appendix 9.1 Dean Moor Solar ATC Data Summary

Appendix 9.2 Dean Moor Construction EFT

Appendix 9.3 Dean Moor Carbon Calculations

Appendix 9.4 Mean Annual Air Temperature Anomaly

Appendix 9.5 Annual Precipitation Anomaly

Appendix 9.6 Maximum Summer Temperature Anomaly

Appendix 9.7 Summer Precipitation Anomaly

Appendix 9.8 Minimum Winter Temperature Anomaly

Appendix 9.9 Winter Precipitation Anomaly

Appendix 9.10 Annual Cloud Cover Anomaly

Appendix 11.1 Phase 1 GCA

Appendix 11.2 CMHA

Appendix 11.3 ALC FSMP

Statutory Consultation Documents

Preliminary Environmental Information Report (PEIR)

Correction: At paragraph 3.2.1 of the PEIR Non-Technical Summary and paragraph 3.2.1 of Chapter 3 of the PEIR reference is made to the proposed solar farm being ‘6.5km east of the small village of Gilgarran’. This is incorrect, and should instead read ‘650m east of the small village of Gilgarran’. We apologise for any confusion this may have caused. The Applicant confirms that assessments undertaken as part of the PEIR have been undertaken in respect of the land 650m east of Gilgarran, and so are not impacted by this error.